Get in touchTransmission Infrastructure Design
Energy Transmission | Technical Assistance & Design

The project consisted of the feasibility study of 50km 110kV transmission line Rwinkwavu-Kirehe and associated substations, 40.71km 110kV transmission line Rukarara-Huye-Gisagara and associated substations, 3x30MVA 110/30kV Bugesera Industrial Park (BIP) substation, 18 km 110kV BIP to BIA transmission line with associated substations, 26.7km-110kV transmission line Gabiro - Nyagatare and associated substations, 1.5km 110kV Rulindo – Gicumbi transmission line and associated substations.